Beeston Bridge

by | May 28, 2026 | New Project!

Bridge & Watercourse Infrastructure Specialist Project

Works carried out for MGroup on behalf of Bedfordshire Council

Our team successfully delivered a robust bridge and drainage installation designed for long-term durability, environmental resilience, and full highway compliance. The project incorporated a combination of heavy-duty concrete bagwork and reinforced concrete bags installed at the pipe inlets and outlets to provide superior erosion protection and structural stability.

To ensure maximum strength and longevity, we installed over 600 SoluForm concrete bags secured with 900 hot-dipped galvanised rebar pins, creating a reinforced retaining solution capable of withstanding demanding ground and water conditions.

The works also included:

  • Tree clearance and site preparation 
  • Full traffic management and highway lane closure implementation 
  • Permit coordination and highway authority compliance 
  • Installation of twin-wall corrugated drainage pipe systems for effective surface and sub-surface water management 
  • Timber safety fencing installed to both sides of the bridge 
  • Crushed asphalt bridge surfacing completed in line with Central Bedfordshire Council specifications
  •  

From enabling works through to final surfacing, our experienced team managed every aspect of the project safely, efficiently, and to the highest construction standards.

Specialists in infrastructure, drainage, bridge construction, and highway-compliant civil engineering solutions.

Latest Projects

British Standards Institution

British Standards Institution

Project The Details This project involved the comprehensive refurbishment and upgrade of a 4,500m² car park, addressing long-term surface failure while improving drainage performance and future-proofing the site for electric vehicle use. Works included breaking out...

Luton Town Hall – External Refurbishment

Luton Town Hall – External Refurbishment

ProjectLuton Town Hall - External RefurbishmentThe Details The works comprise the replacement of all existing windows and glazed doors with upgraded units to match the original architectural style, along with associated internal making good. Brick slips at every floor...

St Brigid Centre for Visual Impairment, Autism & SEN

St Brigid Centre for Visual Impairment, Autism & SEN

ProjectThe Details We constructed the St Brigid Centre for Visual Impairment, Autism & SEN Project at Cardinal Newman High School, for Luton Borough Council. The works consisted of refurbishing the existing DT block into a multiple use building, consisting of...

Bedford & County Golf Club Clapham

Bedford & County Golf Club Clapham

ProjectThe Details We recently completed this project for our client Bedford & County Golf Club Clapham, which involved: Excavation of existing soft landscaping New underground drainage Sub-structures Formation of a reinforced concrete slab Decorative facing...